Loading...
Unit G03, Courtenay House, 10 Courtenay Road, East Lane Business Park, Wembley, Middlesex HA9 7ND
Our Projects

We undertake a wide variety of projects from small domestic systems to large commercial installations

  • All
  • Hybrid
  • Off-Grid
  • Domestic
  • Commerical

Hybrid


7600 Watt Hybrid PV installation with large Victron battery bank installation for large residential home in Lincoln (June 2011)

Hybrid


Battery bank for hybrid PV system consisting of Victron 12V 220AH gel cell batteries. The Nedap inverter is using a 24V battery bank

Hybrid


Complete installed PV system using 5Kw Nedap Power Router inverter linked to 24V Victron Gell Cell battery bank

Hybrid


Overall picture of the battery bank fitted in the spacious garage due to be boxed in for protection and the Nedap Power Router

Off-Grid


2 x Sunny Island 5048 inverters to provide the grid and look after the battery charging, enough for a normal property

Off-Grid


Hoppeke 2V OPzS 1200 batteries in 48v bank linked to Sunny Islands. Note the ‘Aquastop’ on the top of the battery

Off-Grid


Overview of completed plant room showing the Sunny Boy inverters and the Sunny 5058 Islands battery management inverter

Off-Grid


The plant room containing the complete off grid solution with all the inverters and isolators fitted. A nice neat job with a happy client

Domestic


2760 Watt installation on mid terrace house in Greenford, London (October 2011)

Domestic


1520 Watt installation in Maidstone. Fitted around several roof obstructions (May 2011)

Domestic


A 2915 Watt system next door to the previous job in Greenford, London (March 2012)

Domestic


A 2120 Watt domestic system in Greenford, London (March 2012)

Domestic


2280 Watt installation in East Sussex (April 2011)

Domestic


1900 Watt installation on a Park Home in East Sussex (July 2011)

Domestic


3040 Watt installation in Greenwich, London (February 2011)

Domestic


Polycrystalline panels (October 2011)

Domestic


3420 Watt installation in Lincoln (June 2011)

Domestic


1900 Watt installation in Chesham (May 2011)

Commerical


Part of a 20KW commercial system on a trapezoidal roof (March 2012)

Commerical


Commercial 30 Kw installation using Sunny Tripower inverters in North London

Commerical


10Kw commercial installation in Enfield mounted on frames to acheive optimum 30 Degree angle on shallow roof (February 2011)

Commerical


4.25Kw for new Preparatory school extension roof with Sunny Boy inverter, near to Kew Gardens (August 2012)

Commerical


20Kw Ground mounted installation to serve retirement community project (October 2010)

Commerical


12.5Kw Off Grid (standalone) installation on an Alpaca farm in Aylsbury (January 2013)

Commerical


10.8Kw New build extension block for Kings College Hospital in East London (January 2014)

Commerical


10.8Kw New build extension block for Kings College Hospital in East London (January 2014)